Display Pictures of Your Aircraft and Restoration Projects
Forum rules
You must be a member of the Cessna 120-140 Association in order to post new topics, reply to existing topics, or search for information on this forum. Use the "Join" link in the red menu bar.
8342 wrote: ↑Wed Aug 19, 2020 9:16 am
Use the old cable to pull the new one through.
Years ago I modified a turnbuckle to be able to pull a new throttle cable on a Cessna 421.
Rick
Any opinions on using salvaged cables vs new? Steve
It looks like you are doing a very extensive over haul on the rest of the airplane, why not go with new?
That way you know what you are putting in.
They are available from MacFarlane.
8342 wrote: ↑Wed Aug 19, 2020 9:16 am
Use the old cable to pull the new one through.
Years ago I modified a turnbuckle to be able to pull a new throttle cable on a Cessna 421.
Rick
Any opinions on using salvaged cables vs new? Steve
It looks like you are doing a very extensive over haul on the rest of the airplane, why not go with new?
That way you know what you are putting in.
They are available from MacFarlane.
Rick
Makes sense. Are there any issues mixing old with new? Steve
I went back and took another look and the weight savings would be if you used two layers of 104 (light weight) fabric.
Unfortunately you cannot use two layers of 104 fabric on a certified aircraft. You can on experimental.
The first layer needs to be 102 fabric on certified aircraft.
So on a Cessna 140 the weight savings would not apply.
My mistake, sorry.
You still gain added strength, easier application of finish tape, and a cleaner look.
25 Aug 2020 - Both sides of the fuselage are finished. Still a bit on the top that remains, although the cowl area will not be buffed as it will be painted in the factory red trim.
Cessna_140_3771V_25Aug2020e.jpeg (381.23 KiB) Viewed 54380 times
We received the custom 18" Sinclair decals. They look nice and are just the size we needed.
Cessna_140_3771V_25Aug2020a.jpeg (401.9 KiB) Viewed 54380 times
Matt also painted the yokes the 1940s color. This will match some of the instrument panel knobs as well.
Cessna_140_3771V_25Aug2020d.jpeg (341.24 KiB) Viewed 54380 times
5 Sep 2020 - Finally! All the wing control surfaces are stripped. They will get a light buffing to match the top of the plane. Only the two elevators remain to be stripped, then it is wing prep and covering time. Slow but sure, Steve
Cessna_140_3771V_5Sep2020.jpeg (345.96 KiB) Viewed 54380 times
15 Sep 2020 - Matt pulled the wingless plane out for a rinse to get all the residue off. It is looking really nice. Ready to prime for paint trim.
Cessna_140_3771V_15Sep2020.jpeg (183.29 KiB) Viewed 54302 times
18 Sep 2020 - Got the Rudder done. Needs to be buffed along with the ailerons and flaps. Two elevators to go then nothing exterior has paint left on it.
Cessna_140_3771V_18Sep2020.jpeg (360.88 KiB) Viewed 54302 times
A panel question: Is there any way to remove just the knobs of the control panel? I really do not wish to disconnect every cable to remove the plexiglas panel behind them.
Cessna_140_3771V_13Jun2020b.jpeg (339.62 KiB) Viewed 54301 times
Am I missing something or are the knobs permanently crimped to the cables?
2356 wrote: ↑Tue Sep 22, 2020 10:13 pm
You will have to remove the entire cable assemblies. Just removing the knob will not allow you to remove the plexiglass panel.
Sad Face. Any recommendations on how not to mess up what was a working system of cables, controls and instruments? Steve